Representative works

  • Design and execution of Orastie- Sibiu Motorway – Lot 4macara-mic
  • Rehabilitation of Bucharest – Pitesti Motorway km 23+46
  • Execution A3 Motorway – Bucharest-Ploiesti section, km 19+500- km 62+000
  • Expansion to 4 lanes – Bucharest South Bypass, between A2(km 23+600) and A1(km55+520)
  • Rehabilitation of DN 6-Alexandria-Craiova-Lot 2
  • Street maintenance and administration over 4 years, packages 2 and 5
  • Road system rehabilitation and municipal works – package 2
  • Street rehabilitation Package 46- “ Humulesti St., Freamatului St.”
  • Modernization of Romana Square and Pedestrian Passage
  • Rehabilitation of the road system and of the tramway line on Liviu Rebreanu Blvd.
  • Execution works and technical design corresponding to the investment project Spaliul Independentei- Ciurel-Bucharest-Pitesti Motorway Penetration and Connection
  • 4th District road construction, foundation, coating worksAutostrada A1 / Viaduct peste valea Sacel la Km 71+615 / August 2012
  • DRDP BUC.
  • DN 6 Magurele Bypass repair works
  • DN 10Siriu repair works
  • Bitumen coating on DN 7C, DN2, SDN Pitesti
  • BAD 25-type and MASF 16-type asphalt layers on DN2, KM 7+848-km 11+100
  • Tramway line modernization on Manastur- Garii Square-Muncii Blvd. sections
  • Modernization and rehabilitation of Calea Calarasilor St. in Braila City, on the section between Dorobantilor and Independentei Blvd.
  • Modernization of DJ 7031: Musatesti (DN 73C-Bradulet-Bradetu-Poienile Valsanului) to improve and enhance the tourism infrastructure, km 28+822-53+600.
  • Rehabilitation of Liviu Rebreanu tramway tracks
  • Rehabilitation of Soseaua Oltenitei tramway tracks
  • Rehabilitation of Tunari St. tramway tracks
  • Rehabilitation of Buzesti Berzei Uranus tramway tracks
  • Rehabilitation of the Border-Curtici-Simeria railway section, part of the 4th Pan-European Corridor (Section 1: Border – Curtici – Arad- km 614)