- Design and execution of Orastie- Sibiu Motorway – Lot 4

- Rehabilitation of Bucharest – Pitesti Motorway km 23+46
- Execution A3 Motorway – Bucharest-Ploiesti section, km 19+500- km 62+000
- Expansion to 4 lanes – Bucharest South Bypass, between A2(km 23+600) and A1(km55+520)
- Rehabilitation of DN 6-Alexandria-Craiova-Lot 2
- Street maintenance and administration over 4 years, packages 2 and 5
- Road system rehabilitation and municipal works – package 2
- Street rehabilitation Package 46- “ Humulesti St., Freamatului St.”
- Modernization of Romana Square and Pedestrian Passage
- Rehabilitation of the road system and of the tramway line on Liviu Rebreanu Blvd.
- Execution works and technical design corresponding to the investment project Spaliul Independentei- Ciurel-Bucharest-Pitesti Motorway Penetration and Connection
- 4th District road construction, foundation, coating works

- DRDP BUC.
- DN 6 Magurele Bypass repair works
- DN 10Siriu repair works
- Bitumen coating on DN 7C, DN2, SDN Pitesti
- BAD 25-type and MASF 16-type asphalt layers on DN2, KM 7+848-km 11+100
- Tramway line modernization on Manastur- Garii Square-Muncii Blvd. sections
- Modernization and rehabilitation of Calea Calarasilor St. in Braila City, on the section between Dorobantilor and Independentei Blvd.
- Modernization of DJ 7031: Musatesti (DN 73C-Bradulet-Bradetu-Poienile Valsanului) to improve and enhance the tourism infrastructure, km 28+822-53+600.
- Rehabilitation of Liviu Rebreanu tramway tracks
- Rehabilitation of Soseaua Oltenitei tramway tracks
- Rehabilitation of Tunari St. tramway tracks
- Rehabilitation of Buzesti Berzei Uranus tramway tracks
- Rehabilitation of the Border-Curtici-Simeria railway section, part of the 4th Pan-European Corridor (Section 1: Border – Curtici – Arad- km 614)